W11-12, 2021-03-15/03-28
another two weeks gap. "cut and plug your desires!"
dae.wiki
been extremely working on finishing git merge-conflict, but for a full 10 days fixed bugs from existing code along the way. then the day before the deadline i began to work on the UI for it. another empty week is past and i'll get back to this from next week.
dps x magdx
magda proceeded with the design system reference: we managed almost everything, except some extra fancy UI details. most importantly you can get out bits of code from the page fairly easily, and download the whole css
as a file.
trust.support
went through some substantial changes:
- re-worked out again the footnotes system to be able to function from any text-block (ideally including figure caption); it turned out to be a bit of an awkward approach, but otherwise it would have been necessary to make a patch over the existing markdown plugin (not yet please)
- fixed a longstanding problem with yt-embed thumbnail image quality, by ditching the embed plugin and simply using the
<iframe>
embed code given by youtube itself as the basic layer - implemented new design for landing page
juf
went through second round of changes: did lot of custom kerning, fixed other design details etc. next up: payment integration.
TWLA
update call and about to sign off this goddamn contract after three months.
cannot do anything at the computer if not forced. brain refuses, emotions spin up, labor memories fatigue prevails.